ClubWorx Members: The first phase of our renovation is almost complete. We were on schedule to have the flooring finished today as the last step to be able to start using our new space but the flooring installers have been stuck on another job and will not finish in time. With the Town of FV shut down until next Thursday, we won’t be able to get the green light until then (assuming we get the flooring installed).
As soon as we pass final inspections we will move the dumbbells back so the demolition of the new Small Group Training Room can begin. The weight room floor will be shut down that day or the day after, for a period of time to be determined, so that we can lift equipment up onto the new mezzanine. Once that is finished we will reset the remaining pieces on the floor. After the SGT room is completed, the final task will be the installation of the turf. This is now likely to take place towards the middle of January.
Thank you all so much for your patience and support during the renovation!
Have a Merry Christmas and a Happy and Healthy New Year